PROJECT NAME
Ningxia Ningdong energy and chemical industry base underground pipe gallery professional subcontract project
ADDRESS
Ningdong new chemical material Park, Yinchuan City, Ningxia Autonomous Region
STRUCTURE TYPE
Reinforced Concrete Frame Structure
BUILDING CATEGORY
Other
HEIGHT
13.693Km
Project background
■ It is located in Ningdong new chemical material Park, Yinchuan City, Ningxia Autonomous Region; the total length of the standard pipe gallery is 13.693km; the pipe gallery is composed of electric tank, comprehensive tank, sewage tank and steam tank.
■ Structural form: closed frame structure is adopted for cast-in-place reinforced concrete structure. Jinhuan Construction Group mainly undertakes the construction of underground comprehensive pipe gallery in the third bid section;
■ Engineering features and difficulties: the construction area is wide, organization and management is difficult; underground and underground obstacles are complex, which has a great impact on the construction of pipe gallery; geological environment is complex and changeable, underground waterproof and anti-corrosion requirements are high quality; deep foundation pit engineering has a long front line, large volume, complex and variable foundation pit support structure, and monitoring and detection is difficult; mechanical and electrical installation engineering has a large volume, many specialties, and traffic Cross operation is frequent; the goal of engineering excellence is high;
■ Technical features: Construction Technology of horseshoe shaped steel wall corrugated pipe gallery; combination of pipe gallery construction and BIM application; application of aluminum alloy formwork in comprehensive pipe gallery.