PROJECT NAME
Shijiazhuang second ring expressway steel box girder construction of ascension
ADDRESS
Shijiazhuang city, hebei province
STRUCTURE TYPE
Steel Structure of Box Bridge
BUILDING CATEGORY
Bridge structural steel
■ Engineering is based on the second ring road reconstruction project in the original shijiazhuang;
■ The project consists of 9 steel-concrete composite beams with a total length of 45, 50 and 55 meters;
■ Two continuous steel box girders with a total length of 144 meters and 156.2 meters.